Temporary Pedestrian Bridge Now Open On Santa Monica Pier

June 9, 2026 ·

Photo by Gerson Repreza.

SANTA MONICA—On June 5, the city of Santa Monica announced that visitors can now access the Santa Monica Pier from a new perspective, with the opening of a temporary pedestrian bridge that will serve as the primary entrance to the historic Pier for the remaining duration of the Pier Bridge Replacement Project.

The temporary bridge is located about 30 feet south of the original pedestrian access point and will keep the Pier and its businesses and attractions fully accessible throughout the replacement project, which is slated to conclude in late 2027.

The temporary bridge features eye-catching artwork, wayfinding elements to help visitors explore different parts of the Pier, and spotlights on local businesses and restaurants.

Following the opening of the temporary bridge, crews will close the current entrance facing Ocean Avenue and will begin to prepare the existing bridge for demolition, which is scheduled for mid-June.

Additional Pier access points will remain available from:

-Ocean Front Walk
-The protected walkway along the temporary vehicle ramp in the Pier parking lot
-Stairs near Bubba Gump Shrimp Co.

Bikes, skateboards and other small vehicles will not be permitted on the temporary pedestrian bridge and are advised to use Seaside Terrace to access the Pier. Detour and wayfinding signage has been installed throughout the construction zone and the temporary pedestrian bridge.

While construction will introduce a new entrance route, the Santa Monica Pier remains fully open and accessible, with all businesses, attractions, dining and entertainment continuing to operate throughout the project.

Construction on the Pier Bridge Replacement Project began in December 2025 and will replace the 87-year-old bridge connecting Ocean Avenue to the Pier. The new bridge will be a seismically sound structure with improved features and will preserve the character and scenic views of the historic route.

Originally constructed in 1939, and the old bridge no longer meets modern structural or seismic standards. To improve long-term safety, access, and mobility, the city is moving forward with a federally funded replacement project that will deliver a new, seismically sound structure with improved features, including a 15-foot-wide sidewalk to enhance the experience for pedestrians and bicyclists.

Construction is underway and is expected to be completed before the 2028 Summer Olympic and Paralympic Games in Los Angeles.

By Danny Jones

Next Post

Graffiti Removal In Malibu

MALIBU—On Monday, June 8, the city of Malibu announced that in late May, the city started removing graffiti on fire-damaged properties along Pacific Coast Highway in the Palisades Fire area as part of the city’s Graffiti Cleanup Pilot Program. This…
Read
Previous Post

BBB Implements Fare Changes For Mobility On Demand Every Day Program

SANTA MONICA—The city of Santa Monica announced that starting Wednesday, July 1, the Big Blue Bus will implement fare changes to its Mobility on Demand Every Day (MODE) program. The fare change marks the second phase in a three-part fare…
Read
Random Post

Man Arrested After Siccing Dog On Victim

SANTA MONICA—On May 24, at approximately 5:20 p.m. officers with the Santa Monica Police Department assigned to patrol downtown responded to a call of a reported assault with a deadly weapon in the vicinity of 3rd Street and Broadway. Officers…
Read
Random Post

Help Needed To Locate Jessie Ray Kalinowski

WEST HOLLYWOOD—On Wednesday, April 29, the Los Angeles County Sheriff's Department disclosed that they need the public's help to locate Jessie Ray Kalinowski. The Missing Persons Detail noted that Kalinowski AKA “Jess." He was last seen on March 23, at…
Read
Random Post

Davon Dean Dies After Shooting At Santa Monica College

SANTA MONICA—Lt. Erika Aklufi of the Santa Monica Police Department informed Canyon News via email that a suspect involved in a shooting at Santa Monica College on October 14 has died. The Santa Monica Police Department (SMPD) has confirmed that…
Read
Random Post

New Temporary Art Exhibition In City Hall Community Plaza

WEST HOLLYWOOD—On Wednesday, August 7, the city of West Hollywood announced on its website that as part of its Art on the Outside program, has installed Everything and Everybody by artist Sarah Foelske at the West Hollywood City Hall Community…
Read