Santa Monica To Build New Pedestrian Bridge

November 14, 2024 ·

Photo Credit: Shea Rouda

SANTA MONICA—On October 31, the City of Santa Monica announced that the 85-year-old pedestrian bridge that connects Ocean Avenue to the Santa Monica Pier will be replaced in time for the 2028 Olympics.

On November 13, The Malibu Times first reported that in early 2025, once the proper permits are obtained, bids for the job will be accepted by experienced contractors.

The new plans include a 275-foot bridge that widens into four lanes in the area that runs through the Pacific Coast Highway.

Reports indicate that this is a $29 million project that will include the removal, rehabilitation, and reinstallation of the iconic blue Santa Monica Pier sign that has hung above the pier for decades.

The initial announcement was made by the Santa Monica City Councilman, Paul Grisanti is as follows:

“Flanked by the famous blue archway at its entrance, the Pier Bridge is a crucial link from Palisades Park and Colorado Avenue and has welcomed millions of residents and visitors to the world-famous Santa Monica Pier.

The new bridge will include seismic safety upgrades, increased functionality, and accessibility, and will feature expanded walkways, new lighting, and railing.

Both the current Trancas and Corral Canyon projects are taking a lot longer than projected and the Trancas project is smaller than the one proposed at Topanga. With regard to, whether the Santa Monica pedestrian bridge and the other projects can all be completed in time for the July 2028 Olympics,” Grisanti concluded.

By Sharon

Next Post

BHPD Awarded $100,000 Traffic Safety Grant

BEVERLY HILLS—On Wednesday, November 13, the Beverly Hills Police Department reported that it received a $100,000 grant from the California Office of Traffic Safety (OTS) to support its ongoing enforcement and education programs to reduce serious injuries and fatalities on…
Read
Previous Post

Elevator Modernization Project To Start In December

WEST HOLLYWOOD—The city of West Hollywood indicated in a news release on Tuesday, November 12 that it will start an elevator modernization project at the West Hollywood Park 5-Story Parking Structure, located at 625 N. San Vicente Boulevard. Construction will…
Read
Random Post

City Council Approves Malibu Permanent Skate Park

MALIBU—On Tuesday, March 25, the city of Malibu announced on its website that the Malibu City Council approved $4.1 million for the construction of the Malibu Permanent Skate Park, with work set to begin in April 2025. The skate park…
Read
Random Post

Early Morning Burglary At Hollywood Hills Home

HOLLYWOOD HILLS—On May 1, at approximately 6:30 a.m., the Los Angeles Police Department (LAPD) responded to a call of a burglary in progress at the 1800 block of Marcheeta Place. No one was at home at the time. The call…
Read
Random Post

Smash-And-Grab At The Real Real Under Investigation By Task Force

SANTA MONICA—Lt. Erika Aklufi of the Santa Monica Police Department emailed the Canyon News noting that they are investigating a smash-and-grab style robbery that transpired on November 27. The SMPD reported at approximately 10:55 a.m., officers were dispatched to the…
Read
Random Post

Jonathan Rinderknecht Arrested For Igniting Palisades Fire

PACIFIC PALISADES—On October 8, the California U.S. Attorney’s Office issued a press release announcing the arrest of Jonathan Rinderknecht, 29, aka “Jonathan Rinder,” aka “Jon Rinder,” of Florida for starting the Palisades Fire. He made his first appearance in court…
Read