Santa Monica To Build New Pedestrian Bridge

November 14, 2024 ·

Photo Credit: Shea Rouda

SANTA MONICA—On October 31, the City of Santa Monica announced that the 85-year-old pedestrian bridge that connects Ocean Avenue to the Santa Monica Pier will be replaced in time for the 2028 Olympics.

On November 13, The Malibu Times first reported that in early 2025, once the proper permits are obtained, bids for the job will be accepted by experienced contractors.

The new plans include a 275-foot bridge that widens into four lanes in the area that runs through the Pacific Coast Highway.

Reports indicate that this is a $29 million project that will include the removal, rehabilitation, and reinstallation of the iconic blue Santa Monica Pier sign that has hung above the pier for decades.

The initial announcement was made by the Santa Monica City Councilman, Paul Grisanti is as follows:

“Flanked by the famous blue archway at its entrance, the Pier Bridge is a crucial link from Palisades Park and Colorado Avenue and has welcomed millions of residents and visitors to the world-famous Santa Monica Pier.

The new bridge will include seismic safety upgrades, increased functionality, and accessibility, and will feature expanded walkways, new lighting, and railing.

Both the current Trancas and Corral Canyon projects are taking a lot longer than projected and the Trancas project is smaller than the one proposed at Topanga. With regard to, whether the Santa Monica pedestrian bridge and the other projects can all be completed in time for the July 2028 Olympics,” Grisanti concluded.

By Sharon

Next Post

BHPD Awarded $100,000 Traffic Safety Grant

BEVERLY HILLS—On Wednesday, November 13, the Beverly Hills Police Department reported that it received a $100,000 grant from the California Office of Traffic Safety (OTS) to support its ongoing enforcement and education programs to reduce serious injuries and fatalities on…
Read
Previous Post

Elevator Modernization Project To Start In December

WEST HOLLYWOOD—The city of West Hollywood indicated in a news release on Tuesday, November 12 that it will start an elevator modernization project at the West Hollywood Park 5-Story Parking Structure, located at 625 N. San Vicente Boulevard. Construction will…
Read
Random Post

Constructions Beings For Traffic Signal Synchronization Project

MALIBU—The city of Malibu revealed that construction is starting on Malibu’s Pacific Coast Highway (PCH) Traffic Signal Synchronization Project in June to improve traffic safety and mobility on PCH. “PCH is one of California’s most scenic state highways whose beach…
Read
Random Post

Elderly Couple Evicted From Home While Wife Is On Dialysis

SANTA MONICA—A 79-year old Ukrainian man, Dimitry Shuster, and his Lithuanian wife, Regina Smolyansky – who underwent a kidney and liver transplant and is currently on dialysis – were evicted from their apartment on the 1400 block of 21st Street…
Read
Random Post

Beverly Hills Launching Website Survey As Phase One Of Redesign

BEVERLY HILLS—The city of Beverly Hills announced on Monday, October 16 that it launched a new website survey as part of the first phase of its redesign and is seeking community input regarding usability, content and design. After a formal…
Read
Random Post

Kitchen Fire Extinguished In Woodland Hills

WOODLAND HILLS—On Wednesday, January 7, the Los Angeles Fire Department battled a kitchen fire in Woodland Hills. The fire was reported at 3:07 p.m. at 20763 W Dolorosa St. at a one-story, single-family dwelling with light smoke initially showing. The…
Read